01-14-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
01-14-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 7:55:25 AM
Creation date
11/28/2018 2:35:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
St. Paul District <br /> <br />January 14, 2016 <br /> Since the last Diversion Authority meeting, the following project-related activities were worked on: <br />1. Minnesota EIS: Received request for assistance with public comment responses on January <br />6th. This is a top priority for the FMM Team. <br /> 2. Reach 7/Maple River Aqueduct: Flume study completed which analyzed velocity conditions <br />across aqueduct. Final report received on 20 November. <br /> <br />3. Diversion Inlet Structure: Resolution of Final Technical Review (FTR) comments for this <br />gated structure in the works. BCOE review currently scheduled for 22 February. Final plans and specifications anticipated in April 2016. This is a top priority for the FMM Team. <br /> <br />4. Optimization of Diversion Channel and Low Flow Channel: Continuing this work upstream <br />of the Maple River to the Diversion Inlet Structure. <br /> 5. Cemetery Mitigation Plan: Will address Cemetery POC comments on the Draft Plan as part <br />of DA subcommittee work to be performed in 2016. Sent follow-up letters to all Cemetery <br />POCs on 13 August and 3 November. <br /> <br />6. In-Town Levees: Continue to support design and construction to assure features can be incorporated into FMM Project. Includes ATR and IEPR reviews. <br /> <br />7. Alternate Financing/Split Delivery Plan: Assisting with development of RFP and reference <br />documents. Continued reporting/coordination up our chain of command. <br /> 8. Rights-of-Entry (ROE) and Surveys: Preparing ROE request for 2016 to continue performing <br />cultural and HTRW surveys and geotechnical borings. Will require ROE being gained in <br />Minnesota. <br /> <br />9. Real Estate: Continue to review appraisals and support land acquisition activities. <br />10. Mitigation: Continue work to identify additional environmental mitigation sites. Met with state <br />agency representatives on 13 January. <br /> <br />11. Red River Basin Commission Conference: Aaron Snyder will be co-presenting on FMM Project January 21. <br /> <br /> <br />Monthly Update <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.