01-14-2016
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2016
>
01-14-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2016 7:55:25 AM
Creation date
11/28/2018 2:35:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3 <br /> <br />Thanks Rodger, we are working to incorporate these into your task order addendum. <br /> <br />This morning a DA rep asked if we could also add ACM abatement monitoring services for 2 additional upcoming levee <br />projects to this amendment: El Zagal Phase 2 (8 residential home demos) and Michelson Field Levee Extension (4 <br />residential homes demos). <br /> <br />Attached is the Techtron report on these homes. NOTE – 724 North River Road (home was moved, will not be demo’d) <br />and 817 Riverbend Road (not part of either project). <br /> <br />Please review and let me know if you can provide a cost proposal this week for these 12 homes. Demolition work is <br />scheduled for this spring. <br /> <br />If you have any questions, please let me know. Thanks. <br /> <br />John Glatzmaier <br />Project Manager <br />D 1 651 365 8526 <br />M 1 651 253 5910 <br /> <br />CH2M <br />www.ch2m.com <br /> <br />From: Schmidt, Rodger A. [mailto:Rodger.Schmidt@terracon.com] <br />Sent: Wednesday, December 23, 2015 6:56 PM <br />To: Dayao, Francis/JAX <Francis.Dayao@CH2M.com> <br />Cc: Buck, David/FMH <David.Buck@ch2m.com> <br />Subject: Revised Park East proposal and Howard Johnson proposal <br /> <br />Hello Francis <br /> <br />I have attached our revised proposal for Park East and Howard Johnson. <br /> <br />Based on the time estimate from the abatement contractor today on his anticipated completion date of the end of <br />January, I needed to add three weeks to the estimation. <br /> <br />The Howard Johnson Hotel is a best guess since we don’t have a firm abatement timeline. Again, depending on the size <br />of the abatement contractor hired, the number of workers they put on the job, will dictate how long the abatement will <br />take. I plan to conduct additional bulk samples tomorrow for the Howard Johnson property. <br /> <br />Regards, <br /> <br />Rodger <br /> <br />Rodger Schmidt <br />Project Manager – Safety Coordinator I Environmental Services <br />Terracon <br />4102 7th Avenue North I Fargo, ND 58102 <br />P (701) 282 9633 I D (701) 639 4467 I F (701) 282 9635 <br />rodger.schmidt@terracon.com I terracon.com <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.