12-17-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
12-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 9:14:21 AM
Creation date
11/28/2018 2:35:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PROJECT TECHNICAL/MODELING INFORMATION <br />1) Drainage Area: Mi2 (As determined from Standardized Modeling Approach contributing areas) <br />2) Maximum Gated Storage Capacity: Acre-Feet Inches <br />3) Maximum Un-gated Storage Capacity: Acre-Feet Inches <br />4) Maximum Pool Depth: Feet <br />5) Maximum Gated Pool Inundation Area: Acres <br />6) Maximum Un-gated Pool Inundation Area: Acres <br />7) Red River Mainstem Analysis Results: <br />Gated Storage Utilized: Acre-Feet Inches <br />Un-gated Storage Utilized: Acre-Feet Inches <br />Impacted area a peak pool elevation: Acre-Feet <br />Describe the operational assumptions used to determine Red River impacts. <br />8) Are copies of the models used complete the Phase II Estimated MFDA Funding Allocation Worksheet included? <br />□ Yes □ No <br />Explain naming conventions used for the proposed impoundments within the model: <br /> <br /> <br />FINAL – MFDA PHASE II <br />Submittal <br /> II-2
The URL can be used to link to this page
Your browser does not support the video tag.