Laserfiche WebLink
1. <br />2. <br />3. <br />4. <br />6. <br />400 Per Ac-Ft$ [1] <br />[2] <br />[3] <br />[4]=[2] + [3] <br />[5]=[1] × [4] <br />[6][5] × 5%Max. Eligible MFDA Advancement Available for Phase I Activities <br />Use Step 2 results to determine the 8-day volume reduction (Acre-Feet) at USGS Gage No. 05054000 (Red River at <br />Fargo, ND) based on ±4 Days from the present day (2013) peak discharge. Populate volume in [3] below. <br />[6] indicates maximum potential MFDA Funding available for eligible Phase I activities. <br />Metro Flood Diversion Authority Funding <br />MFDA Funding Rate (8-Day Volume Removal) <br />Proposed Project Information <br />Proposed Impoundment Funded 8-Day Runoff Volume Removed <br />USGS Gage No. 05064500 (Red River at Halstad, MN) <br />USGS Gage No. 05054000 (Red River at Fargo, ND) <br />Total <br />Maximum Eligible MFDA Funds <br />Use Step 2 results to determine the 8-day volume reduction (Acre-Feet) at USGS Gage No. 05064500 (Red River at <br />Halstad, MN) based on ±4 Days from the present day (2013) peak discharge. Populate volume in [2] below. <br />PHASE I <br />ESTIMATED MFDA FUNDING <br />ALLOCATION WORKSHEET <br />Project Name: <br />Project Sponsor: <br />Date: <br />Instructions: <br />Populate Project Name , Project Sponsor , and Date fields above. <br />Model the dam or impoundment to determine Red River mainstem impacts.