Laserfiche WebLink
1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />400  Per Ac‐Ft$       [1] <br />[2] <br />[3] <br />[4]=[2] + [3] <br />[5]=[1] × [4] <br />[6] <br />[7]=([5] × 90%) ‐ [6]Max. Eligible FMDA Advancement Available for Phase II Activities <br />PHASE II <br />Total <br />Maximum Eligible FMDA Funds <br />FMDA Funds Advanced During for Phase I Activities <br />FMDA Funding Rate (8‐Day Volume Removal) <br />Proposed Project Information <br />ESTIMATED FMDA FUNDING <br />ALLOCATION WORKSHEET <br />Proposed Impoundment Funded 8‐Day Runoff Volume Removed <br />USGS Gage No. 05064500 (Red River at Halstad, MN) <br />USGS Gage No. 05054000 (Red River at Fargo, ND) <br />Fargo‐Moorhead Diversion Authority Funding <br />Project Name: <br />Project Sponsor: <br />Date: <br />[7] indicates maximum potential FMDA Funding available for eligible Phase II activities. <br />Instructions: <br />Populate Project Name, Project Sponsor, and Date  fields above. <br />Model the dam or impoundment to determine Red River mainstem impacts. <br />Use Step 2 results to determine the 8‐day volume reduction (Acre‐Feet) at USGS Gage No. 05064500 (Red River at  <br />Halstad, MN) based on ±4 Days from the present day (2013) peak discharge. Populate volume in [2] below. <br />Use Step 2 results to determine the 8‐day volume reduction (Acre‐Feet) at USGS Gage No. 05054000 (Red River at  <br />Fargo, ND) based on ±4 Days from the present day (2013) peak discharge. Populate volume in [3] below. <br />Indicate FMDA Funds expended during Phase I Eligible Activities in [6].