Laserfiche WebLink
  <br />FINAL – FMDA PHASE II Submittal   II‐2  <br />PROJECT TECHNICAL/MODELING INFORMATION  <br />1) Drainage Area:  Mi2  (As determined from Standardized Modeling Approach contributing areas)  <br />2) Maximum Gated Storage Capacity:                                 Acre‐Feet                   Inches  <br />3) Maximum Un‐gated Storage Capacity:                                 Acre‐Feet                   Inches  <br />4) Maximum Pool Depth:  Feet  <br />5) Maximum Gated Pool Inundation Area:                              Acres  <br />6) Maximum Un‐gated Pool Inundation Area:                              Acres   <br />7) Red River Mainstem Analysis Results:  <br />Gated Storage Utilized:                        Acre‐Feet                    Inches  <br />Un‐gated Storage Utilized:                       Acre‐Feet                   Inches  <br />Impacted area a peak pool elevation:                                 Acre‐Feet  <br />Describe the operational assumptions used to determine Red River impacts.  <br />8) Are copies of the models used complete the Phase II Estimated FMDA Funding Allocation Worksheet included?  <br />□   Yes □   No  <br />Explain naming conventions used for the proposed impoundments within the model:  <br />  <br />