09-02-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
09-02-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 11:27:18 AM
Creation date
11/28/2018 2:35:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />NOTICE OF INTENT_FINAL 2015 09 02.DOCX 8 <br />Attachment A – Diversion Channel and Associated Infrastructure Work Package (CAI WP) Scope <br />Elements that are currently anticipate to be delivered as the Diversion Channel and Associated <br />Infrastructure Work Package under the PPP Agreement are presented below and shown on Figure 1: <br />Diversion Channel, including Low Flow Channel <br />Inflow Design Flood (IDF) Levee <br />Diversion Channel Outlet <br />Rush River Inlet <br />Lower Rush River Inlet <br />Maple River Aqueduct <br />Sheyenne River Aqueduct <br />Drain 29 Inlet <br />Drain 30 Inlet <br />Drain 14 Inlet <br />Drain 21C Inlet <br />Drain 50 Inlet <br />Drain 47 Inlet <br />CR 31 Bridge <br />CR 18 Bridge <br />CR 32 Bridge <br />CR 22 Bridge <br />CR 20 Bridge <br />CR 10 Bridge <br />38th Street W Bridge <br />CR 8 Bridge <br />CR 6 Bridge <br />CR 14 Bridge <br />I-29 NB Bridge <br />I-29 SB Bridge <br />I-94 EB Bridge <br />I-94 WB Bridge <br />BNSF Hillsboro Subdivision RR Bridge <br />BNSF Prosper Subdivision RR Bridge <br />BNSF K.O. Subdivision RR Bridge <br />RRV RR Bridge <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.