08-13-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
08-13-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 10:33:44 AM
Creation date
11/28/2018 2:35:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Recommended_Contracting_Actions_Summary_2015‐0813 3 <br />Description <br />Budget <br />Estimate ($) <br />WP‐42A.1/42A.3 4th Street Pump Station <br />ICS, Inc. (dba Industrial Contract Services, Inc.) 176,462.97 <br />Change Order No. 2 <br />1. Modifications, including water main relocation and storm water revisions <br />2. Incorporate previously approved WCD‐0002 and WCD‐0003 (Unknown <br />Structure Investigation and Abandonment) <br />3. Change Order No. 1 field changes, including replacement of 12” RCP and <br />parking lot electrical <br />4. Other Modifications, including spare traffic control electrical conduit, <br />Archeological inspection of excavation, and disposal of excavated debris <br />5. Time Extension for weather and Unknown Structure Investigation and <br />Abandonment <br /> <br /> <br />WP‐42A.2 2nd Street/Downtown – In‐Town Levees <br />Industrial Builders, Inc. 225,056 <br />Change Order No. 3 <br />1. Backfill < 882’ <br />2. Backfill > 882’ <br />3. Electric heater <br />4. Louvers <br /> <br /> <br />WP‐F.1S 2nd Street/Downtown – In‐Town Levees <br />Flood Control ‐ 2nd Street North Floodwall, South of Pump Station <br />Industrial Builders, Inc. 16,184,905.85 <br />Contract Award <br />1. Contract Award <br />2. Change Order No. 1 <br /> <br /> <br /> <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.