Laserfiche WebLink
    <br />Recommended_Contracting_Actions_Summary_2015‐0813  3  <br />Description <br />Budget <br />Estimate ($) <br />WP‐42A.1/42A.3 4th Street Pump Station   <br />ICS, Inc. (dba Industrial Contract Services, Inc.) 176,462.97  <br />Change Order No. 2   <br />1. Modifications, including water main relocation and storm water revisions  <br />2. Incorporate previously approved WCD‐0002 and WCD‐0003 (Unknown  <br />Structure Investigation and Abandonment)  <br />3. Change Order No. 1 field changes, including replacement of 12” RCP and  <br />parking lot electrical  <br />4. Other Modifications, including spare traffic control electrical conduit,  <br />Archeological inspection of excavation, and disposal of excavated debris  <br />5. Time Extension for weather and Unknown Structure Investigation and  <br />Abandonment  <br />   <br />   <br />WP‐42A.2 2nd Street/Downtown – In‐Town Levees   <br />Industrial Builders, Inc.  225,056  <br />Change Order No. 3   <br />1. Backfill < 882’  <br />2. Backfill > 882’  <br />3. Electric heater   <br />4. Louvers   <br />  <br />  <br />WP‐F.1S 2nd Street/Downtown – In‐Town Levees   <br />Flood Control ‐ 2nd Street North Floodwall, South of Pump Station  <br />Industrial Builders, Inc.  16,184,905.85 <br />Contract Award   <br />1. Contract Award  <br />2. Change Order No. 1  <br />  <br />  <br />   <br />DR <br />A <br />F <br />T