08-13-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
08-13-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 10:33:44 AM
Creation date
11/28/2018 2:35:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />This is Task Order No. 7, Amendment 4, <br />consisting of 2 pages. <br />Houston-Moore Group, LLC Task Order No. 7, Amendment 4 <br />Recreation and Use Master Plan and Design <br />In accordance with Paragraph 1.01 of the Agreement Between Fargo-Moorhead Flood Diversion Authority <br />(“Owner”) and Houston-Moore Group, LLC (HMG) (“Engineer”) for Professional Services – Task Order Edition, <br />dated March 8, 2012 ("Agreement"), Owner and Engineer agree as follows: <br />The parties agree that in the event of a conflict between prior versions of this Task Order No. 7 and this Amendment, <br />the terms and conditions in this Amendment shall prevail, provided however, nothing herein shall preclude <br />ENGINEER from invoicing for work authorized under prior versions of this Task Order and performed prior to <br />effective date of this Amendment, even to the extent such prior work was revised by this Amendment. All other <br />terms and conditions shall remain the same and are hereby ratified and affirmed by the parties. <br />4. Times for Rendering Services <br /> Beginning with Subtask WP-06 – Reach 4 Draft and Final Submittals through Subtask C. Design Support, <br />change the Completion Time from September 30, 2015 to March 31, 2016: <br />Subtask Start Time Completion Time <br />WP-06 – Reach 4 Draft and Final Submittals June 14, 2012 March 31, 2016 <br />WP-07 – CR32 and CR22 Bridges Draft and Final <br />Submittals <br />June 14, 2012 March 31, 2016 <br />WP-08 – Reach 5 Draft and Final Submittals June 14, 2012 March 31, 2016 <br />WP-09 – BNSF Prosper RR Bridge Draft and Final <br />Design Submittals <br />June 14, 2012 March 31, 2016 <br />WP-10A – Reach 6 Draft and Final Submittals June 14, 2012 March 31, 2016 <br />WP-11 – CR20 Bridge Draft and Final Submittals June 14, 2012 March 31, 2016 <br />WP-25 – Reach 17 Draft and Final Submittals April 9, 2015 March 31, 2016 <br />WP-26 – Reach 18 (Inlet Structure) Draft and <br />Final Submittals <br />April 9, 2015 March 31, 2016 <br />WP-28 – CR17 Bridge Draft and Final Submittals April 9, 2015 March 31, 2016 <br />C. Design Support September 12, 2013 March 31, 2016 <br />5. Payments to Engineer <br /> DELETE and REPLACE Payments to Engineer in its entirety with the following: <br />A. Owner shall pay Engineer for services rendered as follows: <br />I. Compensation for services identified shall be in accordance with the Standard Hourly <br />Rates shown in Appendix 2 of Exhibit C of the Agreement. The total compensation for <br />services identified under the Task Order is not-to-exceed amount as defined in the table <br />below. <br />HMG_TO07-A4_Short.docx 1 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.