06-11-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
06-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:26:01 PM
Creation date
11/28/2018 2:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />iv. Assist in preparation, provide meeting materials, and attend <br />one-on-one meetings with impacted landowners. <br />7. Assist with preparation of materials for public meetings. <br />iii. Provide land surveying services for In Town Levee and OHB Ring Levee projects. The <br />surveying is required to create Right of Way descriptions and certificates of survey for <br />34 partial takes for the OHB Ring Levee and 17 certificates for the In Town Levee <br />project. <br />1. Provide real estate drawings for the El Zagal project per USACE requirements. <br />iv. Deliverables <br />1. Red River Levees – Phase 1 <br />a. Project Schedule with milestone dates for key activities and monthly <br />updates <br />b. Monthly Progress Reports and meeting minutes <br />c. Alignment selection TM <br />d. Geotechnical TM, including: <br />- Geotechnical field and laboratory findings <br />- Geotechnical stability analysis <br />- Survey data <br />- Geotechnical field logs <br />e. Hydrologic and Hydraulic analysis TM <br />f. Transportation TM <br />g. Phase 1 Environmental Site Assessment reports <br />h. Preliminary Design Report, including: <br />- Preliminary pump sizing and storage needs <br />- Utility relocation requirements and issues <br />- Preliminary Levee design <br />- Preliminary Structural design <br />- Cost Estimate <br />- Preliminary Drawings <br />i. Landscape concepts and plans for the 2nd St. Corridor from NP Ave. to <br />4th Ave. <br />j. Master Plan from Mickelson to 4th St. Levee. <br />2. Red River Levees - Phase 2 <br />a. 65 Percent Design Submittal <br />b. 95 Percent Design Submittal <br />c. Cost Estimates <br />d. Operation and Maintenance Plan <br />i. Draft Plan <br />ii. Final Plan <br />3. Red River Levees – VES reports <br />4. Support for Upstream Staging Area Levees <br />a. Oxbow/Hickson/Bakke TM <br />b. WP-43A <br />i. 35 Percent Design Submittal <br />ii. 65 Percent Design Submittal <br />iii. 95 Percent Design Submittal <br />iv. Cost Estimates <br />HMG-TO-13-A10_Long.docx 16 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.