06-11-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
06-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2015 12:26:01 PM
Creation date
11/28/2018 2:35:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />i. Preliminary Levee Design Structural Design – Develop preliminary <br />design of levee protection system, preliminary estimate of <br />embankment and borrow requirements, and prepare a narrative of <br />design criteria. <br />j. Preliminary Structural Design – Develop preliminary design for <br />proposed floodwalls and closures, pump stations, and miscellaneous <br />drainage structures. Prepare a narrative with descriptions of features, <br />design considerations, and criteria assumptions. <br />k. Transportation Evaluation – Develop initial evaluation of <br />transportation impacts, and participate in two (2) coordination <br />meetings with City of Fargo staff and two (2) coordination meetings <br />with railroad staff. Develop up to five (5) alternatives for the 2nd Street <br />road alignment to accommodate flood protection alternatives. <br />l. Preliminary Environmental Studies – Complete Phase 1 Environmental <br />Site Assessment report for six (6) properties. <br />m. Preliminary Design Report and Drawings – Prepare Preliminary Design <br />Report (PDR) with cost estimates and preliminary project plans for <br />selected alignment. Prepare artists renderings of selected plan. <br />n. Project Management – Document coordination and review, schedule <br />and resource management, budgeting, and project team coordination. <br />o. Landscape Architecture/Master Planning- Provide landscape <br />architecture and master planning services for the Red River Levees. <br />i. Provide landscape architecture services for the 2nd St. <br />Corridor from NP Ave. to 4th Ave. Coordinate with the city of <br />Fargo City Hall Project throughout the design phase of the <br />City Hall Project. <br />ii. Provide master planning services from Mickelson to the 4th St. <br />Levee. <br />2. Phase 2 – Detailed Plans and Specifications: Complete detailed project <br />engineering and design and provide plans and technical specifications <br />(Division 2 and higher) for the selected alternative from Phase 1. Include <br />required surveying, environmental studies, permitting, removals and <br />demolition, geotechnical and hydraulic analyses, internal flood control and <br />pumping, levee systems, floodwalls, closures, traffic evaluations, road <br />realignments and signal changes, public and private utility relocations, <br />landscaping, drawings and specifications, internal QA/QC, design <br />documentation, operation and maintenance plan, and project management <br />and coordination. Major milestone deliverables include: <br />a. 65 Percent Design Submittal – evaluate and incorporate accepted VE <br />proposals into the design documents, advance the detailed design to <br />65 percent and submit the design report, plans and specifications for <br />review by the Diversion Authority, PMC, USACE Consistency, Agency <br />Technical Review (ATR) and USACE Independent External Peer Review <br />(IEPR) review teams. <br />b. 95 Percent Design Submittal – evaluate and incorporate 65 percent <br />review comments into the design documents, advance the detailed <br />design to 95 percent and submit the design report, plans and <br />HMG-TO-13-A10_Long.docx 3 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.