<br /> Change Order No. 01 <br /> <br />Date of Issuance: 05/14/2015 Effective Date: 05/14/2015 <br />Owner: Metro Flood Diversion Authority Owner's Contract No.: WP-42A.1/A.3 <br />Owner’s <br />Representative: CH2M HILL Engineers, Inc. <br />Owner’s Representative <br />Project No.: 435534 <br />Contractor: ICS, Inc. Contractor’s Project No.: 1114 <br />Engineer: Houston-Moore Group, LLC Work Package No.: WP-42A.1/A.3 <br />Project: Fargo-Moorhead Area Diversion Contract Name: <br />4th Street Pump Station and Gatewell <br />and 2nd Street Floodwall South <br /> <br />The Contract is modified as follows upon execution of this Change Order: <br />Description: <br />1. FARGO HIGHRISE PARKING LOT MODIFICATIONS <br />a. Replace 37 sheets with the corresponding Change Order 1 sheets, dated 5/14/15, to <br />accommodate changes to the design for modifications of the Fargo Highrise parking lot. <br />b. Incorporate attached Change Order 1 Unit Price Schedule, dated 5/14/15, into Contract Price to <br />accommodate new quantities for items affected by the Change Order 1 drawings, plus the <br />following new line items: <br />i. 0143, Plug Pipe 30” Dia <br />ii. 0144, F&I Curb & Gutter Standard (Type 1) <br />iii. 0145, F&I Grooved Plastic Film 8” Wide <br />iv. 0146, F&I Pipe 15” Dia Reinf Conc <br />2. WARMING HOUSE ELECTRICAL SERVICE <br />a. Re-route permanent power to the Fargo Park District’s warming house according to attached <br />drawing E-020-1, dated 4/22/15, to replace a power line removed by project. <br />b. Incorporate new line item 0147, Warming House Electrical Service, into Contract Price as shown <br />in attached Change Order 1 Unit Price Schedule, dated 5/14/15. <br />3. JACK AND BORE 36” STORM SEWER PIPING <br />a. Install approximately 40 feet of the 36” storm sewer pipe between manholes ST-6 and ST-7 by <br />means of jack and boring according to Contractor’s attached proposed scope and schedule. <br />b. Incorporate new line item 0148, Bore 36” Pipe, into Contract Price as shown in attached Change <br />Order 1 Unit Price Schedule, dated 5/14/15. <br />c. Change date in Agreement paragraph 4.02.A.3 from July 31, 2015 to August 15, 2015. <br />d. Change date in Agreement paragraph 4.02.A.4 from August 20, 2015 to September, 4, 2015. <br /> <br />WP-42A1 A3_Change Order 01.docx Page 1 of 2 <br />DR <br />A <br />F <br />T