05-14-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
05-14-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2015 8:59:45 AM
Creation date
11/28/2018 2:35:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
AWD and Change Order Summary <br />Date: May 14, 2015 AWD and Change Order Summary Budget Estimate ($) <br />Terracon Consultants, Inc. - AWD-00048 Rev-0 <br />Materials Testing Services for Work Package 42 (WP-42) 30,000.00 <br />• Additional budget for Owner’s Quality Assurance (QA) testing on Work Packages 42A.1/A.3 <br />(4th Street Pump Station) and 42A.2 (2nd Street Pump Station) <br />ICS, Inc. - Change Order No. 1 <br />WP-42A.1/42A.3 (4th Street Pump Station) 268,555.24 <br />• Highrise parking lot modifications <br />• Warming house power <br />• Bore 36” storm sewer pipe <br />Total $298,555.24 <br /> <br /> <br />AWD_CHANGE-ORDER_SUMMARY_2015-0514.DOCX 1 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.