Laserfiche WebLink
AWD and Change Order Summary <br />Date: May 14, 2015 AWD and Change Order Summary Budget Estimate ($) <br />Terracon Consultants, Inc. - AWD-00048 Rev-0 <br />Materials Testing Services for Work Package 42 (WP-42) 30,000.00 <br />• Additional budget for Owner’s Quality Assurance (QA) testing on Work Packages 42A.1/A.3 <br />(4th Street Pump Station) and 42A.2 (2nd Street Pump Station) <br />ICS, Inc. - Change Order No. 1 <br />WP-42A.1/42A.3 (4th Street Pump Station) 268,555.24 <br />• Highrise parking lot modifications <br />• Warming house power <br />• Bore 36” storm sewer pipe <br />Total $298,555.24 <br /> <br /> <br />AWD_CHANGE-ORDER_SUMMARY_2015-0514.DOCX 1 <br />DR <br />A <br />F <br />T