<br />Subtask
<br />Current
<br />Budget
<br />($)
<br />Change
<br />($)
<br />Revised
<br />Budget
<br />($)
<br />E. On-Call Services ($250,000 Allowance) 100,000 0 100,000
<br /> E.I. Maximum Project Design Flows 13,658 0 13,658
<br /> E.II. Local Drainage Plan 9,978 0 9,978
<br /> E.III. Reach 1 LFC Meander Modeling 9,693 0 9,693
<br /> E.IV. Geomorphology Consulting 15,736 0 15,736
<br /> E.V. MN EIS Scoping Document Comment
<br />Support
<br />15,000 0 15,000
<br />E.VI. MN EIS Preparation Support 250266,000 16,00015
<br />0,000
<br />266,00041
<br />6,000
<br />E.VII. Cemetery Assessment Team Support 61,000 0 61,000
<br />E.VIII. Large Structure Team Support 25,000 025,000 25,00050,0
<br />00
<br />E.IX. Hydraulic Structures Aesthetics Evaluation 54,000 0 54,000
<br />E.X. Baseline Stream Bank Erosion Evaluation 210,000 0 210,000
<br />E.XI. LFC Modeling: Maple River to Diversion
<br />Inlet
<br />81,0000 81,0000 81,000
<br />TOTAL 1,303,6751,
<br />206,675
<br />175,0009
<br />7,000
<br />1,478,6751
<br />,303,675
<br />B. The terms of payment are set forth in Article 4 of the Agreement and in Exhibit C.
<br />6. Consultants:
<br />A. Barr Engineering Company
<br />B. HDR, Inc.
<br />7. Other Modifications to Agreement: None
<br />8. Attachments: None
<br />9. Documents Incorporated By Reference:
<br />A. AWD-00039 REV-0, Cemetery Berm Conceptual Designs and Rural Water Well Survey, dated
<br />July 10, 2014.
<br />B. AWD-00046 REV-0, MN EIS Support for Additional Information Request, signed December 10,
<br />2014.
<br />HMG_TO08-A10_Long.docx 13