04-09-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
04-09-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2015 9:02:12 AM
Creation date
11/28/2018 2:35:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />2.3. Final Oxbow Park Relocation bidding documents <br /> <br />3. Owner's Responsibilities <br />Owner shall have those responsibilities set forth in Article 2 and in Exhibit B. <br />4. Times for Rendering Services <br />Subtask Start Time Completion Time <br />A. Recreation and Use Master Plan <br />Volume One – Revised Draft <br />June 14, 2012 September 30, 2012 <br />B. Undulation Design – Outlet to I-94: <br />Submit the draft undulation design 45 days prior to the FTR-DQC (for USACE Work Packages) or 45 <br />days prior to the 30 percent submittal (for LERRDS Work Packages). Revise and resubmit final <br />undulation design within 20 days of receipt of review comments. <br />Initial dates for each work package are as follows: <br /> WP-01 – Reach 1 Draft and Final Submittals June 14, 2012 October 4, 2012 <br />WP-02 – CR31/CR4 Bridge Draft and Final <br />Submittals <br />June 14, 2012 October 29, 2012 <br />WP-03 – Reach 2 Draft and Final Submittals June 14, 2012 March 22, 2013 <br />WP-04 – (Reach 3) I-29 and CR81 Bridges Draft <br />and Final Submittals <br />June 14, 2012 October 29, 2012 <br />WP-05 – (Reach 3) BNSF Hillsboro RR Bridge <br />Draft and Final Submittals <br />June 14, 2012 September 30, 2014 <br />WP-06 – Reach 4 Draft and Final Submittals June 14, 2012 September 30, 2015 <br />WP-07 – CR32 and CR22 Bridges Draft and Final <br />Submittals <br />June 14, 2012 September 30, 2015 <br />WP-08 – Reach 5 Draft and Final Submittals June 14, 2012 September 30, 2015 <br />WP-09 – BNSF Prosper RR Bridge Draft and Final <br />Design Submittals <br />June 14, 2012 September 30, 2015 <br />WP-10A – Reach 6 Draft and Final Submittals June 14, 2012 September 30, 2015 <br />WP-11 – CR20 Bridge Draft and Final Submittals June 14, 2012 September 30, 2015 <br />WP-25 – Reach 17 Draft and Final Submittals April 9, 2015 September 30, 2015 <br />WP-26 – Reach 18 (Inlet Structure) Draft and <br />Final Submittals <br />April 9, 2015 September 30, 2015 <br />WP-28 – CR17 Bridge Draft and Final Submittals April 9, 2015 September 30, 2015 <br />C. Design Support September 12, 2013 September 30, 2015 <br />5. Payments to Engineer <br />A. Owner shall pay Engineer for services rendered as follows: <br />I. Compensation for services identified shall be in accordance with the Standard Hourly <br />Rates shown in Appendix 2 of Exhibit C of the Agreement. The total compensation for <br />HMG_TO07-A3_Long.docx 3 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.