Laserfiche WebLink
<br /> <br />Houston-Moore Group, LLC (HMG) <br />Task Order No. 13, Amendment 9 Add $ 190,000 <br />Levee Design and Design Support <br />Subtask 2.B.i.6: El Zagal Phase 2 Levee Design <br />Description: <br />Incorporate AWD-00047 ($50,000) and complete the detailed design of the El Zagal Phase 2 Levee. Work <br />includes required surveying, permit list, removals and demolition support, geotechnical and hydraulic <br />analyses, internal flood control and pumping, levee systems, roadway revisions, public and private utility <br />relocations, landscaping, drawings and specifications, internal QA/QC, design documentation, operation <br />and maintenance plan, and project management and coordination. <br />Background: <br />The El Zagal Phase 2 Levee is a component of In-Town levees that was conceptually evaluated as part of the <br />July 16, 2012 report entitled “Final Technical Memorandum, AWD-00002 – Flows Through Flood Damage <br />Reduction Area” and includes an extension of recently completed El Zagal Phase 1 Levee to the south to tie <br />into high ground. <br />Cost = $ 190,000 <br />Recommendation: <br />PMC recommends authorization for Task Order No. 13, Amendment 9 for $ 190,000. <br /> <br /> <br />TASK_ORDER_SUMMARY_2015-0312.DOCX 3 <br />DR <br />A <br />F <br />T <br /> <br />3/6 <br />/ <br />2 <br />0 <br />1 <br />5