03-12-2015
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2015
>
03-12-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2015 9:33:49 AM
Creation date
11/28/2018 2:35:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Task Order Summary <br />Date: March 12, 2015 Task Order Summary Budget Estimate ($) <br />HMG Task Order No. 9-Amendment 13 <br /> Hydrology And Hydraulic Modeling 90,000 <br />• Provide additional HEC-RAS modeling and recalibration of model to account for <br />additional identified culverts <br />• Provide support for NDSU Agricultural Impacts Study for areas with impacts 1-ft or <br />greater <br />HMG Task Order No. 13-Amendment 9 <br />Levee Design and Design Support 190,000 <br />• Provide El Zagal Phase 2 Levee Design – Includes incorporation of AWD-00047 <br />($50,000) <br /> <br />Total 280,000 <br /> <br /> <br />TASK_ORDER_SUMMARY_2015-0312.DOCX 1 <br />DR <br />A <br />F <br />T <br /> <br />3/6 <br />/ <br />2 <br />0 <br />1 <br />5
The URL can be used to link to this page
Your browser does not support the video tag.