11-13-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
11-13-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2014 11:56:54 AM
Creation date
11/28/2018 2:35:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CH2M HILL <br />657 2nd Ave N #5405 <br />Fargo ND 58105-5405 <br />Ph: (701) 566-5470 <br /> <br />November 13, 2014 <br /> <br /> <br />Metro Flood Diversion Authority <br />Attention: Darrell Vanyo, Chairman <br />211 9th Street South, Box 2806 <br />Fargo, ND 58108 <br /> <br />Subject: Recommendation of Award – Work Package 42A.1/A.3, 4th Street Pump Station <br />Dear Board Members: <br />CH2M HILL (Program Management Consultant) recommends the Metro Flood Diversion Authority award <br />Work Package 42A.1/A.3, 4th Street Pump Station and Gatewell and 2nd Street Floodwall South, to ICS, Inc. <br />in the amount of $17,361,616.35 as the lowest and best bid. <br />We conducted a public Bid Opening for this project on October 28, 2014. No contractors responded to the <br />Mechanical Construction (Contract 3) component of the Work Package; therefore, the Basis of Award is the <br />Combined Construction (Contract 4) component. ICS, Inc. provided the lowest responsive bid for Combined <br />Construction. See attached bid opening summary for details. <br />ICS’s bid for Combined Construction is approximately 9% higher than the Engineer’s Opinion of Probable <br />Cost. However, the bid appears to be complete and consistent with the required work, and is within an <br />acceptable range of the Engineer’s estimate. Therefore, we feel it is appropriate for the Board to approve <br />this award. <br />Contact me at 208-771-1686 or tyler.smith@ch2m.com if you have any questions regarding this <br />recommendation. <br />Sincerely, <br /> <br /> <br />Tyler Smith, P.E. <br />Construction Manager <br />CH2M HILL <br />Owner’s Representative <br /> <br /> <br />c: Bruce Spiller/CH2M HILL <br />Keith Berndt/Cass County <br />Heather Worden/Cass County <br /> <br />Mark Bittner/City of Fargo <br />April Walker/City of Fargo <br />Gregg Thielman/HMG <br /> <br />479407.B3.33.23.01 LTR-DIVAUTH-WP-42A.1-A.3-RECOMMENDATIONOFAWARD-20141113.DOCX
The URL can be used to link to this page
Your browser does not support the video tag.