04-10-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
04-10-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2014 9:33:21 AM
Creation date
11/28/2018 2:35:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> FARGO-MOORHEAD AREA DIVERSION PROJECT <br /> <br />AUTHORITY WORK DIRECTIVE AWD-00036 REV-0 <br />Maple River Aqueduct Technical Support <br /> WORK TYPE: WIK <br />TO: Houston-Moore Group, LLC DATE INITIATED: 4/10/2014 <br />PROJECT: Fargo-Moorhead Diversion Engineering Design <br />OWNER: Flood Diversion Board of Authority <br />The following additions, deletions, or revisions to the Work have been ordered and authorized: <br />OBJECTIVE: <br />Provide continued support services for the USACE’s Maple River Aqueduct physical and numerical models. <br />BACKGROUND: <br />HMG staff has been providing technical support for the Maple River Aqueduct physical and numerical model <br />project. <br />This AWD authorizes the continuation of support services for the Maple River Aqueduct physical and numerical <br />models. <br />SCOPE: <br />The scope for this work includes participating in bi-weekly conference calls, review of draft memos and reports, <br />physical model site visits, and participation in an intermediate results workshop. The scope for this work will be <br />included in a future amendment to Task Order No. 9, Hydrology and Hydraulic Modeling. <br />DELIVERABLES: <br />Deliverables will be defined in a future amendment to Task Order No. 9, Hydrology and Hydraulic Modeling. <br />SCHEDULE: <br />Begin upon receipt of AWD. <br />HOW WORK IS PERFORMED: <br />This work will be performed on a time and material basis. <br />COST: <br />Cost incurred under this AWD is not to exceed $25,000. The limit will not be exceeded without further written <br />approval. The above scope of work will be incorporated into a future amendment to Task Order No. 9, which will <br />supersede this AWD. Costs associated with this AWD will be invoiced under existing Task Order No. 9. <br />REASON FOR CHANGE(S): <br />Required for continued third party technical support of the USACE’s Maple River Aqueduct physical and numerical <br />models. <br />ATTACHMENTS (List Supporting Documents): <br />None <br /> <br />AWD-00036-MAPLERIVERAQUEDUCTTECHSUPPORT-HMG.DOCX 1 OF 2 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.