04-10-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
04-10-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2014 9:33:21 AM
Creation date
11/28/2018 2:35:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> FARGO-MOORHEAD AREA DIVERSION PROJECT <br /> <br />AUTHORITY WORK DIRECTIVE AWD-00037 REV-0 <br />Wild Rice Dam Phase 1 Cultural Investigation <br /> WORK TYPE: LERRDs <br />TO: URS DATE INITIATED: 4/10/2014 <br />PROJECT: Fargo-Moorhead Diversion Engineering Design <br />OWNER: Flood Diversion Board of Authority <br />The following additions, deletions, or revisions to the Work have been ordered and authorized: <br />OBJECTIVE: <br />Begin planning and initiate field work activities for cultural investigations. <br />BACKGROUND: <br />Phase 1 cultural investigations are required for the Wild Rice River Dam Fish Passage Mitigation site. <br />This AWD authorizes planning and field work activities for the cultural investigation. <br />SCOPE: <br />The scope includes a pedestrian survey of the four (4) acre project site, near surface testing (shovel tests and hand <br />soil cores), and evaluation of dam for listing in the National Register of Historic Places. <br />DELIVERABLES: <br />Deliverables include field notes, draft report, and final report. <br />SCHEDULE: <br />Begin upon receipt of AWD. Proposed work schedule (weather and access permitting): complete field work by <br />May 30, 2014; submit draft report, June 30, 2014; thirty-day North Dakota SHPO review ending July 30, 2014; and <br />final report due August 29, 2014. <br />HOW WORK IS PERFORMED: <br />This work will be performed on a time and material basis. <br />COST: <br />Cost incurred under this AWD is not to exceed $60,000. The limit will not be exceeded without further written <br />approval. The above scope of work will be incorporated into a future amendment to Task Order 1, which will <br />supersede this AWD. Costs associated with this AWD will be invoiced under Task Order No. 1, Phase 1 Cultural <br />Resources Investigation. <br />REASON FOR CHANGE(S): <br />Required to maintain project schedule. <br />ATTACHMENTS (List Supporting Documents): <br />None <br /> <br />AWD-00037-WILDRICEDAMPHASE1CULTURAL-INVESTIGATION-URS.DOCX 1 OF 2 <br />DR <br />A <br />F <br />T
The URL can be used to link to this page
Your browser does not support the video tag.