Laserfiche WebLink
  <br />HMG_TO9‐A10_Long.docx  17  <br />Subtask Current Budget  <br />($)  <br />Change  <br />($)  <br />Revised Budget  <br />($)  <br />D. Extend RAS Geometry of  <br />Rush/Lower Rush  <br />17,714 0 17,714  <br />E. Physical Modeling Assistance 10,500 0 10,500  <br />F. ON‐CALL SERVICES (ALLOWANCE) 94,900 0 94,900  <br />F.I. Extreme Rainfall Events 7,500 0 7,500  <br />F.II. Extreme Event Evaluations 26,600 0 26,600  <br />F.III Tributary Peak Model Runs to  <br />Support the Maple River  <br />Aqueduct Physical Model  <br />20,000 0 20,000  <br />F.IV  Additional Assistance for the  <br />Maple River Aqueduct Physical  <br />Model  <br />79,000 0 79,000  <br />F.V  Unsteady HEC‐RAS Modeling  <br />of Existing PMF Inflows  <br />50,000 0 50,000  <br />F.V  Phase 2 Numeric Modeling 60,000 0 60,000  <br />F.VI  Update HEC‐RAS Model  36,000 0 36,000  <br />F.VII  Connecting Channel and 20‐ <br />year Existing Conditions  <br />9,000 0 9,000  <br />F.VIII  Maple River Aqueduct Flow  <br />Analysis  <br />15,000 0 15,000  <br />F.IX  Update HEC‐RAS Models –  <br />Maple River Aqueduct & Reach 6  <br />Bridge  <br />15,000 0 15,000  <br />F.X  Water Monitoring Gage  <br />Survey  <br />5,000 0 5,000  <br />G. Basin‐Wide Retention Support 55,000 0 55,000  <br />H. Phasing Plan Interim Modeling 90,000 0 90,000  <br />I. Phase 7.1 Model Update 140,000 25,000 165,000  <br />J. Update PMF Study with Revised  <br />Distribution of Snowmelt Runoff  <br />80,000 0 80,000  <br />K. Phase 8 Model Update 331,000 0 331,000  <br />L. Update the Balanced  <br />Hydrographs at Hickson, ND  <br />105,000 0 105,000  <br />TOTAL 1,313,341 25,000 1,338,341  <br />DR <br />A <br />F <br />T