03-13-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
03-13-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2014 3:14:18 PM
Creation date
11/28/2018 2:35:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />TASK_ORDER_SUMMARY_2014‐0313.DOCX 3 <br />HMG – Task Order No. 13 – Amendment 4 Increase $ 600,000 <br />Levee Design and Design Support <br />Description: <br />Subtask 2.B.i.4 – Services of Engineer <br />a. Provide design services and prepare detailed plans and specifications for the replacement of the <br />4th Street Levee Pump Station. <br />b. Deliverables include 35% and 95% design submittals, 35% and 95% cost estimates, draft and final <br />operation and maintenance plan, and assisting the PMC with development of bid documents. <br />Background: <br />At the November 8, 2012 Diversion Board meeting, the Board requested the USACE add levees along the <br />Red River to allow increased flow, at a stage of 35 feet, through the protected area. To allow 35 feet <br />through town, the 4th Street levee requires certification. In order to meet certification criteria, the <br />stormwater pump stations on the north end of the levee must be replaced. <br />Cost = $ 600,000 <br />Recommendation: <br />PMC recommends authorization for Task Order No. 13, Amendment 4 for $ 600,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.