Laserfiche WebLink
    <br />TASK_ORDER_SUMMARY_2014‐0313.DOCX  3  <br />HMG – Task Order No. 13 – Amendment 4 Increase $ 600,000 <br />Levee Design and Design Support <br />Description: <br />Subtask 2.B.i.4 – Services of Engineer  <br />a. Provide design services and prepare detailed plans and specifications for the replacement of the  <br />4th Street Levee Pump Station.   <br />b. Deliverables include 35% and 95% design submittals, 35% and 95% cost estimates, draft and final  <br />operation and maintenance plan, and assisting the PMC with development of bid documents.  <br />Background: <br />At the November 8, 2012 Diversion Board meeting, the Board requested the USACE add levees along the  <br />Red River to allow increased flow, at a stage of 35 feet, through the protected area. To allow 35 feet  <br />through town, the 4th Street levee requires certification. In order to meet certification criteria, the  <br />stormwater pump stations on the north end of the levee must be replaced.  <br />Cost = $ 600,000  <br />Recommendation: <br />PMC recommends authorization for Task Order No. 13, Amendment 4 for $ 600,000.    <br />