Laserfiche WebLink
<br />Subtask C, Diversion Inlet Gates, or Subtask E, On-Call Services, without <br />Owner’s authorization by an amendment to this Task Order. <br />Subtask <br />Current <br />Budget <br />($) <br /> <br />Change <br />($) <br />Revised <br />Budget <br />($) <br />A. Meander Belt Width Analyses 322,330 -15,127 307,203 <br />B. Identification and Assessment of Tie-Back Levees 40,000 0 40,000 <br />C. EMB Openings (Allowance) 40,000 -11 39,989 <br />D. Diversion Inlet Gates (Allowance) 75,000 -19,582 55,418 <br />E. On-Call Services ($250,000 Allowance) 177,000 -77,000 100,000 <br /> E.I. Maximum Project Design Flows 15,000 -1,342 13,658 <br /> E.II. Local Drainage Plan 10,000 -22 9,978 <br /> E.III. Reach 1 LFC Meander Modeling 18,000 -8,307 9,693 <br /> E.IV. Geomorphology Consulting 15,000 736 15,736 <br /> E.V. MN EIS Scoping Document Comment <br /> Support <br />15,000 0 15,000 <br />E.VI. MN EIS Preparation Support 0 250,000 250,000 <br />TOTAL 727,330 129,345 856,675 <br />B. The terms of payment are set forth in Article 4 of the Agreement and in Exhibit C. <br />6. Consultants: <br />A. Barr Engineering Company <br />B. HDR, Inc. <br />7. Other Modifications to Agreement: None <br />8. Attachments: None <br />9. Documents Incorporated By Reference: None <br />HMG_TO8-A6_Long.docx 8