Laserfiche WebLink
CASS COUNTY GOV 7012822226 10/04 '02 16:09 N0.812 09/11 <br /> <br />K¢ith D. Be~ndt, <br />October I, 2002 <br />P~e $ <br /> <br /> B. Attend reelings or heatings not standard with bridge development procedure. <br />Houston Engineering would pm:form described work for the ~llowtng lump sum fees: <br /> <br /> · Project TB0501 40*~ Avenue South Structure - $37,291 <br /> <br />Our foes are based on the assumption that the exiHJ~g stmctore will be replaced with a 4 lane <br />bridge that/neludes both north and soath wallcways. Should thi* a~amptinn prove to be <br />inaccurate, we reserve the fight to renegofiate thc scope of work and professional fees. <br /> <br />The work will begin and be completed witl~n a time flame to allow for bidding in 2003 or 2004 <br />for 2004 construction. Estimates o f man-hmtr~ for each project with our 2002 Hourly Rates are <br />attached, <br /> <br />Again, thank you for the opportunity to provide this lymposal to Ca~s County. <br />If you have any questions, please feel f~ee to call us. <br /> <br />Sincerely, <br /> <br />HOUSTON ENG~CEEKING, KqC. <br />Richard L. C. mnd ¢~on <br /> <br />RLG: <br />Enclosure <br /> <br /> <br />