Laserfiche WebLink
Keith D. Berndt, P.E. <br />June 5, 2002 <br />Page 3 <br /> <br />Additional Engineering Services not include in this proposal: <br /> <br /> A. Any construction services, such as construction observation or staking. <br /> <br /> B. Attend meetings or hearings not standard with bridge development procedure. <br /> <br />Houston Engineering would perform described work for the following lump sum fees: <br /> <br /> · Project CB0301 12th Avenue North Structure - $19,468 <br /> <br /> · Project TB0301 Stanley Township Road - $22,284 <br /> <br /> Our fees are based on the assumption that both bridges can be replaced with multiple cell box <br /> culverts. <br /> <br /> At 12th Avenue North in West Fargo, we anticipate that two large box culverts will provide the <br /> necessary hydraulic capacity. At the Stanley Township crossing, we estimate that a triple line of <br /> 15' by 15' (or approximate equivalents) will provide adequate capacity. Should these <br /> assumptions prove to be inaccurate, we reserve the right to renegotiate the scope of work and <br /> professional fees. <br /> <br /> The work will begin and be completed within a time frame to allow for construction in 2002. <br /> Estimates of man-hours for each project with our 2002 Hourly Rates are attached. <br /> <br /> Again, thank you for the opportunity to provide this proposal to Cass County. <br /> <br /> If you have any questions, please feel free to call us. <br /> <br /> Sincerely, <br /> <br /> HOUSTON ENGINEERING, INC. <br /> <br /> Richai'd L. <br /> <br /> RLG: <br /> Enclosure <br /> <br /> <br />