Amendments
Laserfiche
>
Public
>
County Commission
>
2002
>
07-01-2002
>
Amended items
>
Amendments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:13:51 PM
Creation date
8/5/2002 7:18:37 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
llouston n#ineBr n#, Inc. <br /> <br />2505 N. University Dr., Box 5054 · Fargo, ND 58105-5054 <br /> <br />June 5, 2002 <br /> <br />Keith D. Bemdt, P.E. <br />Cass County Engineer <br />Cass County Highway Dept. <br />PO Box 698 <br />West Fargo, ND 58078 <br /> <br />SUBJECT: <br /> <br />· Ph: 701-237-5065 Fax: 701-237-5101 <br /> <br />Preliminary Engineering Services for Project No. CB0301 <br />Section 31 Reed Township, 12t" Avenue North <br />Bridge Replacement, Bridge No. WF 1.2 <br /> <br />Preliminary Engineering Services for Project No. TB0301 <br />Sections 6-7 Stanley Township, 2 miles north of Horace <br />Bridge Replacement, Bridge No. 138-31 <br /> <br />Dear Mr. Berndt: <br /> <br />Thank you for giving our firm the opportunity to perform the preliminary engineering for the <br />above listed projects. Enclosed, herewith is a listing of the responsibilities, as we understand the <br />project, and a fee proposal. <br /> <br />Houston Engineering responsibilities are as follows: <br /> <br />I. Engineering <br /> <br />C. <br /> <br />D. <br /> <br />E. <br /> <br />F. <br /> <br />G. <br /> <br />H. <br /> <br /> I. <br /> <br /> J. <br /> <br />Analyze hydraulics for the Sheyenne River crossing alternatives and perform <br />scour calculations. <br /> <br />Attend TSL, PS & E and Preconstruction meetings. <br /> <br />Set grades and establish profile. <br /> <br />Set grades for new road and structure approaches <br /> <br />Prepare preliminary road/structure design plans. <br /> <br />Prepare final road/structure design plans. <br /> <br />Prepare design of railings for bridges. <br /> <br />Prepare construction details. <br /> <br /> List traffic control devices, if required. <br /> <br /> Provide input for specifications and bid documents for project. <br /> <br />Minneapolis Office · 10900 73rdAve. N.,Suite 106 <br />Bismarck Office · 304 East Rosser Avenue, Suite 220 <br /> <br />Equal Opportunity Employer <br /> <br />· Maple Grove, MN 55369-5400 · Ph: 763-493-4522 · Fax: 763-493-5572 <br />· Bismarck, ND 58501-4012 · Ph: 701-323-0200 · Fax: 701-323-0300 <br /> ww~houstonengineeringinc, com <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.