<br />~ 4.3 Unit prices, if any, are as follows: <br /> <br />Description Units <br />Base Bid <br />Delete face brick and rigid insulation; change <br />to 8" insulated colored rock face block ext. <br />walls. Change the foundation wall to 8". <br />West parking lot delete curb and gutters, west <br />sidewalk and pavement. <br />Delete work to remove and replace west <br />gravel parking lot. <br />Delete soffits and projection screen at lunch <br />room. <br />Delete gyp bd ceiling above toilets and <br />vestibules and provide acoustical ceilings, <br />Change corian window sills to plastic lam, <br />Delete automatic door operator at Drs 108 <br />and 108A. <br />Switch tapered ISO syst. to tapered expanded <br />polystyrene (EPS) insulation, Minimum <br />tapered thickness would be 6" at the roof <br />drains. <br />Credit site demo work including removal of <br />plants, existing trees, parking lot removal, <br />curb and gutter removal, stripping of top soil <br />and stockpiling of topsoil for re-use. <br /> <br />Price ($ 0.00) <br />$739,500.00 <br />($19,785,00) <br /> <br />($20,660,00) <br /> <br />($1,010.00) <br /> <br />($2,510,00) <br />($570,00) <br /> <br />($725,00) <br />($2,450,00) <br />($6,580.00) <br /> <br />($12,300.00) <br /> <br />ARTICLE 5 PAYMENTS <br />~ 5.1 PROGRESS PAYMENTS <br />~ 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for <br />Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the <br />Contractor as provided below and elsewhere in the Contract Documents. <br /> <br />~ 5,1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of <br />the month, or as follows: <br /> <br />~ 5,1.3 Provided that an Application for Payment is received by the Architect not later than the Thirty-first day of a <br />month, the Owner shall make payment to the Contractor not later than the Twentieth day of the following month, <br />If an Application for Payment is received by the Architect after the application date fixed above, payment shall be <br />made by the Owner not later than Forty-five ( 45 ) days after the Architect receives the Application for Payment. <br /> <br />~ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the <br />Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract <br />Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported <br />by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the <br />Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. <br /> <br />~ 5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the <br />end of the period covered by the Application for Payment. <br /> <br />~ 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be <br />computed as follows: <br /> <br />AlA Document A101'M -1997, Copyright @ 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1980, 1987, 1991 and 1997 by The <br />American Institute of Architects, All rights reserved. WARNING: This AlA" Document is protected by U.S. Copyright Law and International Treaties. 3 <br />Unauthorized reproduction or distribution of this AlA" Document, or any portion of it, may result In severe civil and criminal penalties, and will be <br />prosecuted to the maximum extent possible under the law, This document was produced by AlA software at 08:42:43 on 05119/2005 under Order <br />No.1000150575_1 which expires on 12/8/2005, and is not for resale. <br />User Notes: (449937859) <br />