f. Contract approval
Laserfiche
>
Public
>
County Commission
>
2002
>
07-22-2002
>
Consent agenda
>
f. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2003 1:31:22 AM
Creation date
7/16/2002 6:45:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Include the following paragraph verbatim in any subcontracts they sign relative to this project: <br /> <br />The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, <br />or sex in the performance of this contract. The contractor shall carry out applicable <br />requirements of 49 CFR Part 26 in the award and administration of USDOT-assisted contracts. <br />Failure by the contractor to carry out these requirements is a material breach of this contract, <br />which may result in the termination of this contract or such other remedy as NDDOT deems <br />appropriate. <br /> <br />2. To comply with requirements of 23 CFR Part 633, Required Contract Provisions, and 23 CFR Part <br /> 635, Construction and Maintenance. <br /> <br />To construct the project in conformity with the construction contract. Changes to the plans shall <br />meet the requirements of the current edition of NDDOT's Local Government Manual and 23 CFR <br />Part 625, Design Standards for Highways. <br /> <br />4. To construct the project in conformity with the approved environmental documents, and implement <br /> any measures mitigating the environmental impact of the project. <br /> <br />5. To comply with the procedures outlined in the current edition of NDDQT's Local Government <br /> Manual <br /> <br />6. To comply with the current edition of NDDOT's Right of Way Acquisition Procedures for Local <br /> Public Agency Federal Aid Projects. <br /> <br />The County will be responsible for any consideration, avoidance, and minimization of impacts upon <br />real property related to this project, such as changes in the grades of streets, inconvenience to <br />property or business, and any loss of light, air, view, access, egress, drainage, support, or <br />nuisance. <br /> <br />Comply with all the requirements imposed by Title VI of the Civil Rights Act of 1964 (78 STAT. 252), <br />the regulations of the Federal Department of Transportation, 49 CFR Part 21, and Executive Order <br />11246, relative to the employment practices under any engineering contract awarded in conjunction <br />with this agreement. If the County fails to comply with the federal or state civil rights requirements <br />of this agreement, sanctions may be imposed by FHWA or NDDOT as may be appropriate, <br />including, but not limited to: <br /> <br />a. Withholding of payments to the County under the agreement until the County causes <br /> compliance, or <br /> <br />b. Cancellation, termination, or suspension of the agreement, in whole or in part. <br /> <br />Part II <br /> <br />Contracting and Construction: <br /> <br />1. On behalf of the County, NDDOT will: <br /> <br />a. Prepare the bid proposals, print and distribute the proposals and plans, solicit proposals and <br /> include the project in a scheduled bid opening, as provided in NDCC Chapter 24-02. <br /> <br />Evaluate the bids as to the sufficiency of Small Business participation and the bidders good faith <br />efforts in satisfying the requirements of the current edition of special provision, Small Business <br />Participation and 49 CFR Part 26, Participation by Disadvantage Business Enterprises in DOT <br /> <br />2of5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.