Laserfiche WebLink
CASS COUNTY GOV 7012822226 05/10 '02 07:18 N0.676 02/11 <br /> <br />BRAUN <br />INTERTEC <br /> <br />March 20, 2002 <br /> <br />Braun Inl~tee e,,.~oMon <br />6801 Washington Avenue <br />Mlnn~polis, Minnesota 55439-1500 <br />952-941 -§600 Fax~ 941-4151 <br /> <br /> Ifle guilt and Natural <br /> <br />Proposal BADX-02-P00 ! 83. <br /> <br />Mr. Keith Bemdt, PE <br />Cass County Engineer <br />120I West Main Avenue <br />P.O. Box 698 <br />Fargo, ND 58078-0698 <br /> <br />Dear My. Bemdt: <br /> <br />Re: Deflection Testing tN' the 2002 Season <br /> <br />We are plea~ed to resubmit our proposal for evaluating the pavements on Cass County roads in <br />North Dakota as per ou~ e-mail oommu~ieations with you. The s~op~ of works bas be~n expanded <br />to include pavement oondition surveys using the Corps of Engin~rs Pavement Condition Index <br />(PCl) method. Rates for testing Portland Cement Cortor~t~ pavements has also been included. <br />Data collected will he analyzed and where applicable, the results will be compared with the 1997 <br />test r~sults. <br /> <br />Because the total mileage stated in your e-mail is well in excess of 80 miles, we are offering a 1.0% <br />di,~ount offthe total pHee for the deflection testing and PCI survey. The discount Js taken offthe <br />"greater tim, 45 miles" rates ineh,~ded in the at'sc ed scope orserviees. <br /> <br />Please review the scope of services and if our rates meet your needs, complete the Data Analysis <br />Form, indicat~ the type of analysis, sign the Acceptance Form and remm them to Braun Intertec <br />Corporation. By providing this information early, we are hoping to coordinate testing in similar <br />geographic ]ocatJoos to reduce thc cost o£mobiliz~ttJon to you. <br /> <br />Enclosed are the following: <br /> <br /> Proposed Scope of Services; <br /> · Data Analysis Form; and <br /> · Oe~.e~al Condi.tio~s. <br /> <br />Please note the added fields on the Data Analysis Form requesting information about scheduling. <br />Indicate it'there is a special requirement as to when the roadway should be tested or when you <br />would like to have the final report. If there are no requirements as to when to conduct the testing, <br />these roadways will be incorporated into our statewide schedule. We will notify you when we will <br />be testing in your counl3,. <br /> <br /> <br />