3. Jail expansion update
Laserfiche
>
Public
>
County Commission
>
2005
>
03-21-2005
>
Regular agenda
>
3. Jail expansion update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 11:01:30 AM
Creation date
3/15/2005 9:05:47 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />February 16,2005 <br /> <br />Foss <br />I <br /> <br />Associates <br /> <br />Archi tecture & <br />Interiors <br /> <br />Ms. Bonnie Johnson <br />County Coordinator <br />Cass County <br />211 9th Street South <br />Fargo, North Dakota 58102 <br /> <br />Re: #0509; Addition to the Cass County Jail <br /> <br />Dear Ms. Johnson: <br /> <br />As a follow-up to our meeting on the 27th of January, I provide for your use the following <br />response for review and consideration. Please find enclosed a/an - <br /> <br />1. Draft agreement for professional services, AlA Document B 141-1997, Part 1 <br />outlines the scope of Architectural and Engineering Services to be provided by our <br />office and consultants to Cass County for a 96-bed addition to the Jail. <br />2. Project schedule, which identifies the period of time required for completing design, <br />the bidding, and an estimated construction time frame with owner transition to <br />inmate occupancy anticipated happening by January 1,2007. <br />3. Estimated cost for a jail expansion that contains 96 additional beds, demolition, a <br />modification of existing space to provide secure vertical circulation for jail staff <br />between the first and second levels. A perimeter chase(s) around any new addition <br />intended to house plumbing, electrical and fire protection devices, this in response to <br />a request to provide easier access for lifetime service of fixtures and devices. The <br />continued use of the steel "Acoustic Deck" above the cells in all pods (on the <br />original jail project this was an add alternate for all housing areas, this is now <br />projected to cost an additional $59,000 for the new expansion area). A line item on <br />the estimate is included that identifies contractor profit and overhead for the new <br />construction in the amount of $193,000. Inflationary markups with "out of the <br />ordinary material" escalations could amount to as much as $746,000, and finally a 5% <br />or $175,000 contingency is being suggested for any owner approved change during <br />the design and construction or possible earmarked for security furnishing etc. <br />Following completion of schematic design, that estimate will better reflect the actual <br />cost of this construction. <br /> <br />The critical integration of the some new equipment into the existing jail systems has been <br />identified as HV AC controls, security card reading, door controls and the key/locking <br />systems. Cass County's desire to extend these vendor components into the jail expansion is <br />undeniably a step toward assuring system compatibility and a simplification of any required <br />service in the future by only having to contact a single vendor for each of the systems. <br /> <br />701.282.5505 <br /> <br />810 1st Avenue Notth <br />PO Box 2823 <br />Fargo, Notth Dakota 58108 <br />Fax 701.232.5338 <br />e-mail info@fossassociates.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.