1. Road/Orchrd Glen slide eros
Laserfiche
>
Public
>
County Commission
>
2005
>
03-07-2005
>
Regular agenda
>
1. Road/Orchrd Glen slide eros
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2005 4:17:58 PM
Creation date
3/1/2005 11:15:20 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECEIVEli <br /> <br />CASS COUNTY COMMISSIOI'! <br /> <br />AGREEMENT <br /> <br />~1 <br />,,() ( <br />c (~p\\ <br />)1.. ' <br /> <br />MAR <br /> <br />7 2005 <br /> <br />THIS AGREEMENT is made and entered into this - day of , <br />2005, by and between KATHERINE MURPHY, a single person, Fargo, North Dakota <br />("Murphy") and CASS COUNTY, NORTH DAKOTA, a political subdivision ("Cass <br />County") . <br /> <br />WHEREAS, Murphy is the owner of the following-described real property located in <br />Cass County, North Dakota: <br /> <br />[legal] <br />("Murphy Property"); and <br /> <br />WHEREAS, Cass County, through a flood protection and flood buyout in the late 1990's <br />is the owner of a large part of Chrisan Glen Subdivision, including, but not limited to the <br />property adjacent and immediately to the east of the Murphy Property and described as follows: <br /> <br />[legal] <br /> <br />. and <br />, <br /> <br />WHEREAS, for undetermined purposes, which may include natural erosion along the <br />river bank and the drainage of water ftom the apple orchard in Chrisan Glen Subdivision, the <br />river bank on the Cass County property has begun to fail and the failure has now impinged on <br />the Murphy Property to a lesser extent; and <br /> <br />WHEREAS, the Murphy Property is substantially improved with a residence for Murphy, <br />and the parties desire to take reasonable action to attempt to curtail the erosion of the river bank <br />at its current location. <br /> <br />NOW, THEREFORE, in consideration of the above recitals, the terms and conditions <br />herein contained and for other valuable consideration, the receipt and sufficiency of which is <br />hereby acknowledged, the parties agree as fonows: <br /> <br />1. Coordinated through the efforts of Keith Berndt, Cass County's engineer, Cass County <br />will establish, contract for and complete a remediation plan to either re-route the drainage from <br />the apple orchard or install drainage pipe under the top soil to effect a drainage of the apple <br />orchard directly into the river for the purposes of trying to eliminate the saturation of the soil in <br />the current area of failure. Additionally, CaBS County will contract for the necessary and <br />appropriate grading of the river bank and such other remedial procedures as may be appropriate <br />to shore up the river bank to prevent further failure on to the Murphy Property. The specifics of <br />Cass County's intended action is included on the attached Schedule 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.