1a. Vector building revision
Laserfiche
>
Public
>
County Commission
>
2005
>
01-03-2005
>
Regular agenda
>
1a. Vector building revision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2004 11:28:25 AM
Creation date
12/27/2004 11:26:55 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I CASS C ÖUN1Y1 <br />IGOVERNMENT <br />i ..1..1 <br /> <br /> <br />I__m -------- --- --------- ~.__...! <br /> <br />Highway <br />Department <br /> <br />Keith D. Berndt, P.E. <br />County Engineer <br /> <br />Richard S. Sieg <br />Superintendent <br /> <br />Thomas B. Soucy, P.E. <br />Design and Construction <br /> <br />Supervisor <br /> <br />1201 West Main Avenue <br />P.O. Box 698 <br />West Fargo, North Dakota <br />580ï8-0698 <br /> <br />701-298-2370 <br />Fax 701-298-2395 <br /> <br />RECEIVED <br /> <br />DEC 2 7 2004 <br /> <br />MEMORANDUM <br /> <br />CASS COUNTY COMM!~~W"'; <br /> <br />TO: <br /> <br />Cass County Commission <br /> <br />Keith Berndt, Cass County Engineer :7!~-' <br /> <br />FROM: <br /> <br />DATE: <br /> <br />December 23, 2004 <br /> <br />SUBJECT: <br /> <br />Agenda Item for January 3, 2004 Meeting: Revision to <br />Vector Building Plan <br /> <br />I'm writing to seek approval of a revision to the vector building floor plan <br />that was previously approved. I would like to enlarge the addition to add a <br />room to house our engineering material testing and surveying equipment <br />storage. The material testing is currently done in a small office trailer <br />parked next to the highway building. The survey equipment is stored in <br />several locations that would be more convenient if consolidated. <br /> <br />The additional space would add in the range of $50,000 - $75,000 to the <br />building cost. <br /> <br />SUGGESTED MOTION: Authorize County Engineer to direct the <br />Architect to revise the building addition floor plan to include space for a <br />material testing and engineering equipment storage room. <br /> <br />J:\Admin-Eng\Coml11ission Corrsp\2004 Correspondence\Agenda Vector Building revision.doc <br /> <br />!. <br />
The URL can be used to link to this page
Your browser does not support the video tag.