Laserfiche WebLink
<br />I CASS C ÖUN1Y1 <br />IGOVERNMENT <br />i ..1..1 <br /> <br /> <br />I__m -------- --- --------- ~.__...! <br /> <br />Highway <br />Department <br /> <br />Keith D. Berndt, P.E. <br />County Engineer <br /> <br />Richard S. Sieg <br />Superintendent <br /> <br />Thomas B. Soucy, P.E. <br />Design and Construction <br /> <br />Supervisor <br /> <br />1201 West Main Avenue <br />P.O. Box 698 <br />West Fargo, North Dakota <br />580ï8-0698 <br /> <br />701-298-2370 <br />Fax 701-298-2395 <br /> <br />RECEIVED <br /> <br />DEC 2 7 2004 <br /> <br />MEMORANDUM <br /> <br />CASS COUNTY COMM!~~W"'; <br /> <br />TO: <br /> <br />Cass County Commission <br /> <br />Keith Berndt, Cass County Engineer :7!~-' <br /> <br />FROM: <br /> <br />DATE: <br /> <br />December 23, 2004 <br /> <br />SUBJECT: <br /> <br />Agenda Item for January 3, 2004 Meeting: Revision to <br />Vector Building Plan <br /> <br />I'm writing to seek approval of a revision to the vector building floor plan <br />that was previously approved. I would like to enlarge the addition to add a <br />room to house our engineering material testing and surveying equipment <br />storage. The material testing is currently done in a small office trailer <br />parked next to the highway building. The survey equipment is stored in <br />several locations that would be more convenient if consolidated. <br /> <br />The additional space would add in the range of $50,000 - $75,000 to the <br />building cost. <br /> <br />SUGGESTED MOTION: Authorize County Engineer to direct the <br />Architect to revise the building addition floor plan to include space for a <br />material testing and engineering equipment storage room. <br /> <br />J:\Admin-Eng\Coml11ission Corrsp\2004 Correspondence\Agenda Vector Building revision.doc <br /> <br />!. <br />