Laserfiche WebLink
<br />12/09/04 09:24 FAX <br /> <br />!4J 01 <br /> <br />.5~J?~ 3 <br /> <br />PROPOSAL <br />FARGO LINOLEUM CO. <br /> <br />317 Roberts Street. Fargo. ND - 58102 <br />(701) 232-2493 - Fiilx (701) 293-5440 <br /> <br />CLIENT: Cass County Highway Depl <br />ATTN: Keith Berndt <br /> <br />DATE: December 09.2004 <br /> <br />For the sum Eighteen Thousand Two Hundred Fifty-Six and 25/100 <br />Dollars $18,256.25 <br />We propose to and furnish and install Bigelow Riviera carpet and vinyl base for the <br />specified area in the highway department offices. The areas included are 100. 103. 104. <br />104A & B. 106. 107. 108. 109. 110. 111, 111A. and area between 104 and 111. This <br />includes removal of existing carpet and vinyl base. This does not include moving of any <br />furniture. This cal1)et is subject to price change after January 1. 2005. <br /> <br />This quotation does not include any fees associated with plumbing work that may be necessary to <br />complete the job, Unless otherwise stated, this Quotation does not include any fees associated with <br />fabricating or staining wooden trim or cutting doors down to accommodate higher flooring. <br />If existing floor coverings must be removed. owner must furnish written documentation that there is no <br />asbestos present in the existing floor covering materials and adhesives or this proposal can not be <br />honored, Owner is responsíble for removing any materials that contains asbestos. <br /> <br />The above quotation includes all material. tax and labor required to do the work in a good <br />workman like manner. <br /> <br />Applicable state sales or use tax is included. ~ <br />This proposal is subject to acceptance by the owner within 30 days from this proposal date.. ~ Own <br />~net cash on completion. unless specifically stated on this proposal. On Contract jobs where <br />applicable the following terms shall apply: 90% of the value of materials and labor tom ished shall be <br />payable on the 1 st day of the month following the furnishings of such materials and labor. Balance of <br />contract price shall be payable on the 1 st day of the month following completion of job. <br />This document constitutes the entire agreement between the parties. Changes in specifications causing <br />extra labor and materials shall be charged on a time and material basis. <br /> <br />Accepted: <br /> <br />FARGO LINOLEUM CO. <br />317 ROBERTS STREET <br />FARGO, ND 58108 <br /> <br />BY:~ <br />: Robert Bye <br /> <br />~L-- <br /> <br />By: <br /> <br />Date: <br />CassCo untyh i gh way2. wpslrb <br />