11-15-2004 Agenda
Laserfiche
>
Public
>
Road Advisory Committee
>
2004
>
11-15-2004 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2004 9:35:20 AM
Creation date
11/12/2004 12:18:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> CASS COUNTY <br /> NOVEMBER 2004 REVISIONS HIGHLIGHTED IN ITALICS <br /> 2005-2006 COUNTY FEDERAL AID PROGRAM <br /> COUNTY SECONDARY PROGRAM <br />County Priority <br />& Project NoJ Estimated <br />Type of Work Project Location Length Total Cost Federal Aid Bid Date <br />1 Bituminous Overlay Hwy. 22 - 1-29 to Red River 2.94 $500,000 $400,000 2005 <br />2 Grading & Bijuminous Locally funded grading 2005 Federal <br />Surlacing Hwy. 14 - Hwy. 17 to 1-29 4.00 $2,000,000 $1,600,000 Aid SurfacIng 2006 <br />3 PCC repairs, shoulder & $600,000 in 2005 $480,000 in 2005 2005 - Shoulder & culverts 2006- <br />Bijuminous Overlay Hwy. 81 - Hwv. 16 to State Hwy. 46 6.35 $2,400,000 in 2006 $1,920,000 in 2006 Bituminous overlay <br />4 Bituminous Overlay Hwy. 10- Hwy.11 to Hwy.17 7.05 $1,100,000 $880,000 2007 <br />5 Bituminous Overlay Hwy. 4 - Hwy. 5 to State Hwy. 18 8.06 $1,300,000 $1,040,000 2007 <br />BRIDGE REPLACEMENT PROGRAM <br />County Priority Project Estimated Total <br />NoJBrldge No. Project Location Cost Federal Aid Bid Date <br />1 BRU-8-984(099)102 - $2,640,000 (+ <br />FGO-29 - Share w/MN Red River, County Road 20 $6,600,000 engineering) =1/2 2005 <br />2 DPI-0036(010)091 - <br />Br. No. 138-31.0 Sheyenne River, 2 Miles North of Horace $900,000 $720,000 2005 <br />4 Structure Replacement - <br />9-113-39.1 Hwy 7 -Maple River Bridge - 6 East & 6 South of Alice $350,000 $280,000 2ODã 2008 OR LA TER <br /> 2OOS FUND WITH LOCAL FUNDS SINCE <br />5 Structure Replacement - Hwy 16 -Section 4 Davenport Twp & Section 33 of Addision Twp - STRUCURES ARE LESS THAN 20 FEET <br />9-130-36.0 Drain 14 - 2 West of Davenport $250,000 $2OO,OØO AND NOT EUGIBLE FOR FEDERAL AID. <br />6 Structure Replacement - Everest Twp - Between Sections 29 & 30 - 3 West 4 South of <br />9-120-29.0 Casselton - Branch of Maple River $350,000 $280,000 2ODã 2008 OR LA TER <br />7 Structure Replacement - <br />9-105-27.0 Hwv 12 -Maple River Bridge - 2 West 6 North of Alice $450,000 $360,000 2ODã 2008 OR LATER <br />3 Structure Replacement - <br />Perley Bridge - 142-04.0 - <br />Share with Norman Co., MN Red River Hwv 26 Bridae - 6 East 2 North Gardner $2,500,000 $1,000,000 2006 <br />8 Structure Replacement - Maple River Twp - Section 13 - 1 West 3 South of Durbin - Branch of <br />9-125-33.2 Maple River - Drain No. 39 $400,000 $320,000 :M}Ofi 2008 OR LA TER <br />9 Structure Replacement - Buffalo Twp - Section 36 & Wheat land Twp - Section 31 "4 West 1 <br />9-113-24.0 South of Wheatland - Creek $250,000 $200,000 :M}Ofi 2006 OR LATER <br /> <br />J:\Admin-Eng\Employ..\Tom~2005 2006 County Federal Aid Program Attechment 2 {revised Nov 04).xlsJSheet1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.