Laserfiche WebLink
<br />Summary Sheet <br />Vector Control Facility Option 6 <br /> <br />10/11/2004 <br /> <br />General Conditions <br /> <br />$37,300,00 <br /> <br />Site Work <br /> <br />$34,350,00 <br /> <br />Concrete <br /> <br />$42,580,00 <br /> <br />Masonry <br /> <br />$42,360,00 <br /> <br />Metals <br /> <br />$12,808,00 <br /> <br />Wood & Plastic <br /> <br />$37,664,00 <br /> <br />Moisture Protection <br /> <br />$31,630,00 <br /> <br />Doors/Frames <br /> <br />$24,480,00 <br /> <br />Finishes <br /> <br />$80,050,00 <br /> <br />Specialties <br /> <br />$16,370,00 <br /> <br />Equipment <br /> <br />$2,000,00 <br /> <br />Furnishings <br /> <br />$0,00 <br /> <br />Special Construction <br /> <br />$0,00 <br /> <br />Conveying Systems <br /> <br />$0,00 <br /> <br />Fire Protection <br /> <br />$0,00 <br /> <br />Mechanical <br /> <br />$80,000,00 <br /> <br />Electrical <br /> <br />$45,000,00 <br /> <br />Subtotal <br />O&P <br /> <br />10% <br /> <br />$486,592,00 <br />$48,659,00 <br /> <br />$535,251,00 <br /> <br />Total Construction Estimate <br />