1a. Courthouse chiller replacement
Laserfiche
>
Public
>
County Commission
>
2014
>
01-06-2014
>
Regular agenda
>
1a. Courthouse chiller replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2013 2:19:42 PM
Creation date
12/31/2013 2:19:41 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Install new owner furnished circulating pump. (this pump was furnished by <br /> Grant's Mechanical as a standby on a previous project) <br /> • Enhance and add glycol as required to maintain 35%by volume. (the glycol was <br /> previously tested by Dow-Therm and approved for use) <br /> • All required crane service. <br /> • Testing and balancing of the hydronic system for chiller flow only. <br /> • All required permits. <br /> Not included: <br /> • All temperature control work. <br /> • All electrical wiring, line and low voltage. <br /> For the budgeted sum of: $98,600.00 <br /> Yours truly; <br /> Grant E. Johnson PE <br />
The URL can be used to link to this page
Your browser does not support the video tag.