Laserfiche WebLink
( Giant's <br /> MECHANICAL <br /> December 10, 2013 <br /> Cass Co <br /> Fargo,ND <br /> Attn: Jason Benson <br /> Re: Chiller Installation Cass Co. Shop and Vector Control <br /> Dear Sir: <br /> We propose to perform the following labor and material for a new 40 ton Trane Chiller <br /> installation. This outline is for the chiller and associated labor and materials for the <br /> chiller installation. <br /> • Remove existing direct expansion condensers, coils and refrigerant piping. <br /> • Provide a system of welded and grooved hydronic piping on the roof to each of 2 <br /> air handlers. Piping system shall be a primary-secondary loop system. <br /> • All required hydronic accessories. <br /> • Flushing and cleaning of system. System shall be filled with 35%ethylene glycol <br /> and DI water. <br /> • Testing and balancing of hydronic system. <br /> • Provide a McQuay-Daikin 40 ton air cooled chiller on the roof of the Vector <br /> building. <br /> • Provide 2 chilled water coils. <br /> • Provide"I"beam supports with all required roofing. <br /> • Provide and install safety railing as per OSHA standards. <br /> • Required crane service and permits. <br /> • All required engineering. <br /> DESIGN•BUILD•MAINTAIN <br /> MECHANICAL CONTRACTORS <br /> 3239 157"STREET SOUTH <br /> BOX 7128 <br /> FARGO,NORTH DAKOTA 58106-7128 <br /> PHONE: 701-232-8891 FAX: 701-237-4711 <br /> EQUAL OPPORTUNITY EMPLOYER <br /> www.grantsmechanical.corn <br />