2. Resolut/MetroCog Trans Plan
Laserfiche
>
Public
>
County Commission
>
2004
>
08-16-2004
>
Regular agenda
>
2. Resolut/MetroCog Trans Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:15:08 PM
Creation date
8/10/2004 12:57:07 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Figure 6: Cass County - Potential Future Transportation Improvement Projects for Short Range (2004 - 2010) <br /> <br /> <br />STREETS AND HIGHWAYS <br /> Comprehensive Corridor Preservation Program If' c"" """ be yes For areawide projects, INo comments IliA, IV A 13,6,7 <br /> Preserve future alterial roadway corridors as identified in the $ (l) incurred if the environmental <br /> Fringe land Use Guide and Transportation Plan through ROW County sensitvity will be <br /> dedication during platting or through advance purchase purchases ROW studied on a project by <br /> (examples include: 40th Ave S, 52nd Ave S, 64th Ave S. 76th for preservation. project basis. <br /> Ave 5, 88th Ave S, 100th Ave 5, 45th 5t, 9th 5t E, CR17, 81st <br /> 5t 5, 93rd 5t 5, and 105th 5t 5) <br /> 64th Avenue South I $900,00q(T) I I yes Wetlands/River No comments III A, IV A, VI A 11,3,6,7 <br /> Replace Bridge over 5heyenne River <br />J <br /> Red River Bridge (Clay CSAH 22/ Cass CR 20) I $3'300'00~(T) runded jointly I yes IWetiands/River, INo comments IIA,IIA,IVA,VIA 11,2,3,4,6,7 <br /> Reconstruct bridge at Red River in north Fargo, including 10' $660,00 (l) with Clay County. probability of <br />3 I wide multi-use paths on either sides. $2,640,00 (F) Total project cost archaeological sites <br /> is $5.7 M. <br /> County Road 17 (1-94 to 52nd Ave S) I yes IWetlands/River INo comments liliA, IV A 13,5,7 <br /> Corridor Improvements <br />:J No comments <br /> County Road 17 (52nd Ave S to Horace) I $600,00q(T) I I yes Wetlands/River liliA, IV A 13,6,7 <br /> Asphalt overlay <br />5 <br /> <br /> <br />Executive Summary - Fargo-Moorhead Metropolitan Area Transportation Plan Update <br />Fargo-Moorhead Metropolitan Council of Governments <br /> <br />June 2004 <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.