Laserfiche WebLink
<br />Figure 6: Cass County - Potential Future Transportation Improvement Projects for Short Range (2004 - 2010) <br /> <br /> <br />STREETS AND HIGHWAYS <br /> Comprehensive Corridor Preservation Program If' c"" """ be yes For areawide projects, INo comments IliA, IV A 13,6,7 <br /> Preserve future alterial roadway corridors as identified in the $ (l) incurred if the environmental <br /> Fringe land Use Guide and Transportation Plan through ROW County sensitvity will be <br /> dedication during platting or through advance purchase purchases ROW studied on a project by <br /> (examples include: 40th Ave S, 52nd Ave S, 64th Ave S. 76th for preservation. project basis. <br /> Ave 5, 88th Ave S, 100th Ave 5, 45th 5t, 9th 5t E, CR17, 81st <br /> 5t 5, 93rd 5t 5, and 105th 5t 5) <br /> 64th Avenue South I $900,00q(T) I I yes Wetlands/River No comments III A, IV A, VI A 11,3,6,7 <br /> Replace Bridge over 5heyenne River <br />J <br /> Red River Bridge (Clay CSAH 22/ Cass CR 20) I $3'300'00~(T) runded jointly I yes IWetiands/River, INo comments IIA,IIA,IVA,VIA 11,2,3,4,6,7 <br /> Reconstruct bridge at Red River in north Fargo, including 10' $660,00 (l) with Clay County. probability of <br />3 I wide multi-use paths on either sides. $2,640,00 (F) Total project cost archaeological sites <br /> is $5.7 M. <br /> County Road 17 (1-94 to 52nd Ave S) I yes IWetlands/River INo comments liliA, IV A 13,5,7 <br /> Corridor Improvements <br />:J No comments <br /> County Road 17 (52nd Ave S to Horace) I $600,00q(T) I I yes Wetlands/River liliA, IV A 13,6,7 <br /> Asphalt overlay <br />5 <br /> <br /> <br />Executive Summary - Fargo-Moorhead Metropolitan Area Transportation Plan Update <br />Fargo-Moorhead Metropolitan Council of Governments <br /> <br />June 2004 <br />Page 13 <br />